2017

20.11.2017

Launching ceremony in Nauta Shiprepair Yard

On November 17th, Nauta Shiprepair Yard launched a newly built partly outfitted fishing vessel for a Danish client. It was sixth launching ceremony in Newbuilding Division this year.

CLIPPERTON (B-438) is a vessel designed for pelagic trawling. The vessel is 63 m long and almost 13 m wide, the draft is 5.5 m. Swedish shipowner – B-C Pelagic AB will be the final owner of the ship

05.06.2017

Fishing trawler launched in Nauta Shipyard

On June 2nd, Nauta Shiprepair Yard succesfully launched a newly built partly outfitted fishing trawler Rockall. It was third launching ceremony in Nauta Shipyard this year. Rockall is also the tenth unit which was built by Nauta for Karstensens Skibsvaerft AS.

28.04.2017

Dock with tanker tilts in Nauta Shipyard – situation under control

Yesterday (April 27th, 2017) at around 1:30 p.m., floating dock No 1 located in our Gdynia premises holding a Norwegian tanker under the repair gradually tilted and finally came to rest on its side.

The situation was quickly brought under control. All personnel were expeditiously evacuated and no one was injured. Both the dock’s and vessel’s position are now stable and any possible leakages have been secured.

03.04.2017

Nauta Shiprepair Yard launched another fishing trawler

Nauta Shiprepair Yard launched another fishing trawler On March 31st Nauta Shiprepair Yard launched partly outfitted fishing vessel for the Dannish client – Karstensens Skibsvaerft AS. M/V AINE will operate in the waters of the North Sea.
22.02.2017

One of the most powerful pelagic vessel in the world launched at Nauta Yard

On 21st February launching ceremony of partly outfitted fishing trawler m/v VOYAGER took place at Newbuilding Division of Nauta Shiprepair Yard in Gdańsk. It will be one of the most powerful fishing vessel in its class.
© Nauta Shiprepair Yard. All rights reserved.
Design and administration by eximius.pl