Enlarged production potential

Nauta Shiprepair Yard has increased its production potential. The new facilities include:
a) Dry dock SD I (240 m x 40 m) together with Southern Quay in Gdynia.
b) Slipways B1 (280 m x 36 m)and B 3 (177 m x 28.7) in GdaƄsk

nauta-news-2013-12_nowy-teren_8906.jpg
nauta-news-2013-12_nowy-teren_5363.jpg
nauta-news-2013-12_nowy-teren_4256.jpg
© Nauta Shiprepair Yard. All rights reserved.
Design and administration by eximius.pl